Over 2000 metal building prices posted on website!

Choose a Savings OPTION Below

OPTION A: Pay $500 Above Cost
OPTION B: Pay $800 Above Cost
OPTION C: Pay 10% Above Cost

We Can Only Formally Quote Folks Prepared to Pay Chosen Profit Amount by Close of Business Day

Premium Building

step 2                                    OPTION B - $800 Above Cost

 

Scroll down to view steel buildings cost

 

Integrity Building Sales BBB Business Review
Steel Buildings Cost Premium Building

Premium Building Key Features:

  • 1:12 Roof Pitch
  • Heavy '24' Gauge Roof & Wall Sheeting
  • 1- Framed Opening

Standard Features Included in all Models

First and foremost, our metal buildings come with a 40 year warranty on colored walls and trim, as well as a  25 year galvalume roof warranty.  Of course, the building is made of solid I-beam construction,  coupled with a lifetime structural warranty.  Compared to some firms only using a back-to-back light gauge red iron cee section for  the columns and rafters.  This lighter material does not hold the same deflections as I-Beam, therefore, those buildings may require additional concrete, in order to support loads which then prevents fasteners from losing integrity over time. 

Features continued...

Receive all bolts, screws, closures, weather stripping, sealants, fasteners as required to erect structure, with a lifetime warranty on roof fasteners.  In addition, note that the pre-punched connecting clips for the structural members, including endwall columns, are welded in place and then primed during fabrication.  Similarly,  note that all structural elements for the specified framed openings (jamb, girts, and headers) are pre-cut and pre-punched and it follows that the necessary clips are welded on during fabrication.

Find another great feature in our complete trim package, not to mention our 26 gauge sheeting - 80,000 p.s.i. tensile strength that has a 1 1/4" sheeting profile.

Equally impressive, is our clear span design (no interior columns), and our purlin bearing rib (PBR) which have a larger overlap than R panels.  Find that all panels incorporate the purlin bearing profile.  Choose either red or gray interior column finish, however, gray will be an additional cost.  Click Specifications for additional information.   Foundation plans, anchor bolts and erection services are not included.

 

Certification Plans and Manufacturer's Credentials

While other companies charge extra for stamped plans, FSO includes:

  •  Letter of Certification
  •  2 Sets of erection plans - certified stamped
  •  2 Sets Anchor Bolt plans - certified stamped

Note the building manufacturer is IAS (International Accreditation Service) accredited and MBMA (Metal Building Manufacturer Association) member.

Prices in table below reflect cable braces in optimal locations, as well as reflect full roof snow load - not ground snow load | Codes: IBC2012

 Steel Building Prices posted are within 3% accuracy.

Premium Building - Steel Buildings Cost

Size4lb./115mph20lb./115 mph30lb./115mph40lb./115mph60lb./115mph0lb./130mph0lb./150mph
30'x30'x12'$6,464 $6,481 $6,522 $6,615 $7,017 $6,464 $6,798
30'x30'x14'$6,999 $7,016 $7,062 $7,155 $7,551 $6,999 $7,358
30'x40'x12'$7,507 $7,533 $7,724 $7,920 $8,993 $7,509 $7,907
30'x40'x14'$8,109 $8,141 $8,313 $8,522 $9,608 $8,124 $8,502
30'x50'x12'$8,540 $8,707 $8,977 $9,313 $10,729 $8,561 $8,983
30'x50'x14'$9,176 $9,345 $9,617 $9,878 $11,348 $9,213 $9,663
30'x50'x16'$10,015 $10,061 $10,336 $10,714 $12,133 $10,064 $10,376
30'x60'x12'$9,985 $10,072 $10,186 $10,455 $11,828 $9,985 $10,300
30'x60'x14'$10,623 $10,709 $10,910 $11,183 $12,602 $10,616 $11,042
30'x60'x16'$11,545 $11,653 $11,842 $12,121 $13,636 $11,552 $11,990
40'x40'x12'$9,091 $9,223 $9,858 $10,332 $11,586 $9,131 $9,590
40'x40'x14'$20,261 $9,903 $10,478 $11,025 $12,299 $9,795 $10,211
40'x60'x12'$11,850 $12,121 $13,015 $13,486 $15,268 $11,889 $12,340
40'x60'x14'$12,667 $12,910 $13,839 $14,342 $16,056 $12,687 $13,220
40'x60'x16'$13,696 $13,947 $14,859 $15,443 $17,096 $13,785 $14,286
40'x60'x18'$14,421 $14,613 $15,634 $16,176 $17,832 $14,461 $15,137
40'x72'x14'$14,323 $14,523 $15,827 $16,465 $18,653 $14,418 $15,221
40'x72'x16'$15,429 $15,665 $16,949 $17,714 $19,973 $15,553 $16,420
40'x72'x18'$16,268 $16,398 $17,849 $18,576 $20,775 $16,394 $17,426
40'x80'x14'$15,622 $15,901 $17,398 $18,140 $21,003 $15,700 $16,546
40'x80'x16'$16,865 $17,157 $18,677 $19,398 $22,060 $16,989 $18,009
40'x80'x20'$18,569 $18,815 $20,445 $21,167 $23,897 $18,777 $20,073
40'x100'x14'$19,057 $19,098 $20,911 $21,796 $25,608 $19,155 $19,917
40'x100'x16'$20,490 $20,544 $22,406 $23,297 $27,121 $20,674 $21,348
50'x75'x14'$17,871 $18,465 $20,261 $21,245 $24,170 $18,124 $18,934
50'x75'x16'$19,127 $19,753 $21,526 $22,629 $25,672 $19,310 $20,383
50'x75'x18'$20,000 $20,613 $22,458 $23,454 $26,305 $19,894 $21,163
50'x75'x20'$20,853 $21,516 $23,416 $24,487 $27,460 $21,408 $22,927
50'x100'x14'$22,626 $23,416 $25,504 $27,015 $31,048 $22,881 $23,821
50'x100'x16'$24,194 $25,034 $27,099 $28,681 $32,957 $24,420 $25,632
50'x100'x18'$25,262 $26,080 $28,220 $29,615 $33,671 $25,564 $26,907
50'x100'x20'$26,332 $27,225 $29,408 $30,997 $35,160 $26,915 $28,650
50'x125'x16'$29,055 $30,202 $32,460 $34,690 $39,634 $29,299 $30,542
60'x100'x14'$25,323 $27,471 $29,640 $31,961 $37,068 $25,601 $26,835
60'x100'x16'$26,920 $28,969 $31,117 $33,656 $37,648 $27,210 $28,461
60'x100'x20'$29,325 $31,301 $33,911 $36,016 $40,809 $29,946 $31,583
60'x125'x16'$32,276 $34,811 $37,796 $40,649 $46,048 $32,589 $34,257
60'x125'x18'$33,612 $36,142 $39,375 $41,951 $47,634 $33,833 $35,948
60'x125'x20'$34,994 $37,625 $41,008 $43,234 $49,745 $35,721 $37,343

self quote process

Write down your prices. Total up your delivered price.

 

AFTER you have reviewed Options A and B,  you may request a formal quote (Option C)

 

Option A: Self Quote from BLOWOUT Deals.  Pay only $500 above cost.

 

Option B: Self Quote from listed building prices.  Pay only $800 above cost.  Click on links below:

  1. How to Use Site
  2. Steel Building Prices then click on desired model. Then write down price of desired building.
  3. Building Accessories Prices
  4. Roll Up Door Prices
  5. Insulation Prices
  6. Choose Building Color
  7. Add Shipping Cost

 

Option C: We Quote your building.  Pay only 10% above cost.  Click here for REQUIREMENTS to receive our ACTUAL COST.

  • Integrity Building Sales has an A+ grade with the Better Business Bureau (BBB), est 2010

  • We post and quote our true cost

  • You control Profit Added by choosing Option A, B or C

  • Everyone is guaranteed a savings PLUS one additional feature above any other offer

  • Your integrity sustains our program

    ***PLEASE REFRAIN from requesting IBS to quote its actual cost if you are not prepared to pay accepted profit amount by CLOSE OF BUSINESS DAY*** 

What company informs you of their steel buildings cost? Integrity Building Sales does not follow industry protocol. It is willing to let you know its actual steel buildings cost! If you are a prepared buyer, choose your Option today to determine your savings.

Don’t rush into a purchase. Do your research by collecting as many competitor’s quotes as your desire. It will not be long before you realize the benefit of buying from Integrity Building Sales.

 

Why Utilize Integrity Building Sales

1

No Upfront Cost! Integrity Building Sales posts and quotes its ‘actual’ wholesale cost FIRST for FREE!

2

You choose the profit amount to be added to IBS ‘actual’ cost.  Customer pays profit by close of business day.

3

Certified plans are completed in 10 -14 days. Standard building delivery in 8 weeks. Available 3 week building delivery.

4

IBS has been established since 2010 and maintains an A+ BBB grade. Major manufacturer is IAS certified and MBMA member.

5

Pay your deposit directly to certified manufacturer, not a broker! Quotes are guaranteed $500 below market quotes (40x60x14 and larger). Average savings $3,250!